Stanwell Power Station in Queensland is a significant operation. With a 20 storey high boiler house, a turbine hall the length of three football fields and a 210 metre chimney stack, it is capable of generating 1,400 megawatts.

The Station holds a world record for number of days in continuous operation – 1,073. With so much at stake, the Station keeps its planned outages to an absolute minimum with the injection and support of Spotless’ man power.

We supply the Station with up to 20,000 additional man hours in sundry labour each year. Our staff are site inducted and trained in site-specific systems and confined space entry. Hot, wet and cramped work locations are commonplace during an outage – and long working shifts need to be rostered.

This is our area of expertise. We are committed to getting Stanwell back online as quickly and safely as possible. We enforce the strictest fatigue management protocols at Stanwell. We assign risk assessment and safe work procedures to each and every task that’s carried out. This ensures that the Station is kept running by a highly efficient and highly compliant workforce.

In addition to man power, we assist with continual improvement across the Station’s assets. We manage the gardens, the daily removal of coal rejects from the mills, the treatment of spiders, cockroaches and termites, the waste removal of tyres, light bulbs, batteries and contaminated soil, general and steel recycling, wood collection, site access, reception and perimeter surveillance.

Spotless is more
Spotless provides facilities management and asset maintenance support services at over 100,000 client sites across Australia and New Zealand.
“Such is their attention to detail that Spotless’ standard of work has become a benchmark for other contractors at Stanwell. Spotless offers a high level of competence and this is a benefit to us.”
- Contracts Manager, Stanwell Corporation Limited
CASE STUDY SNAPSHOT
  • The Station keeps its planned outages to an absolute minimum with the injection and support of Spotless’ man power.
  • We supply the Station with up to 20,000 additional man hours in sundry labour each year.
  • We assign risk assessment and safe work procedures to each and every task that’s carried out. This ensures that the Station is kept running by a highly efficient and highly compliant workforce.